- Rehabilitation, Up gradation & Widening of existing Highway to Rigid Pavement 2 Lane / 4 Lane with Paved Shoulder of Phaltan to Dahiwadi Pkg I ( Km 301.430 to 340.250) on EPC mode
- (Client: M/s RRSM Infra Pvt. Ltd )
- Rehabilitation, Up gradation & Widening of existing Highway to Rigid Pavement 2 Lane / 4 Lane with Paved Shoulder of Phaltan to Mhaishal Pkg II Design Chainage: - (Km 340+250 to 392+950Km) on EPC mode.
- (Client: M/s RRSM Infra Pvt. Ltd )
- Construction of 4 Lane PS from Km 140.200 to 167.326 Chikkodi Gotur section including Chikkodi Bypass on NH 548B in the State of Karnataka on Hybrid Annuity Mode.
- (Client: M/s RRSM Infra Pvt. Ltd )
Widening, Reconstruction and Up-gradation to 2 LPS/ Four Lane configuration for the work of Ahmednagar to Sabalkhed and Ashti to Chinchpur Section in the state of Maharashtra on EPC mode.
- (Client:
M/s RRSM Infra Pvt. Ltd
)
- Construction of 6 lane flyover from Khapari ROB to Mihan Interchange and upgradation of existing 4 LPS road to 6 LPS with service road by flexible pavement in section of Nagpur - Hyderabad in the state of Maharashtra on EPC mode.
- (Client:
M/s RRSM Infra Pvt. Ltd
)
- Four laning of Gyaraspur-Rahatgarh section of NH-146 from Design Chainage Km. 88+361 to Design chainage at Km.124+470 in the state of M.P. HAM mode
- (Client:
M/s RRSM Infra Pvt. Ltd
)
Upgradation of Shahdol-Sagartola section of NH 543 from 0/000 to km 69+ 400 to 2 lane with Paved Shoulders under hybrid Annuity mode(HAM) in the M.P.
- (Client:
M/s RRSM Infra Pvt. Ltd
)
- 4-lane highway from Km 0+000 to 42+040 Bhopal (Ratnaigiri Tiraha) to Vidisha (Morikodi) of NH-146 under Bharat mala pariyojana in the state M.P. on HAM mode.
- (Client:
M/s RRSM Infra Pvt. Ltd
)
- Four laning of Kolhapur - Sangli section of NH-166 [from Sangli Phata (km 0.00) to Chokak (km 7.738) & Chokak (km 145.300) to Ankali (km 171.171) (Design Length - 33.609 km in the State of Maharashtra to be executed on Hybrid Annuity Mode under NH (O).
- (Client:
M/s RRSM Infra Pvt. Ltd
)